Closed 2010 04 20 to 2010 05 19
|
|
 |
|
 |
|
Montería Landfill gas recovery and flaring
|
|
 |
|
The Montería Landfill Gas and Flare Project (MLF) intends to capture and flare the LFG generated at the Montería Landfill (MLF) located in one of Colombia’s most important middle-sized cities: Montería.
|
|
 |
|
 |
Closed 2010 04 20 to 2010 05 19
|
|
 |
|
 |
|
Montenegro Landfill gas recovery and flaring
|
|
 |
|
The Montenegro Landfill Gas and Flare Project (MLFGP) intends to capture and flare the LFG generated at the Montenegro Landfill (MLF) located in the Quindío Region of the Colombian Central Coffee Zone.
|
|
 |
|
 |
Closed 2010 04 20 to 2010 05 19
|
|
 |
|
 |
|
Pirgua Landfill gas recovery and flaring
|
|
 |
|
The Pirgua Landfill Gas and Flare Project (PLFP) intends to capture and flare the LFG generated at the Pirgua Landfill (PLF) located in one of Colombia’s most important middle-sized cities: Tunja.
|
|
 |
|
 |
Closed 2010-01-30 to 2010-02-28
|
|
 |
|
 |
|
Installation of a high-pressure/high-efficiency bagasse boiler to cogenerate heat and power
|
|
 |
|
The project aims at reducing CO2 emissions through the installation of a new high efficiency biomass-fired boiler for steam and electricity generation in Ledesma sugar mill, which currently fires bagasse and fossil fuels in two cogeneration plants
|
|
 |
|
 |
Closed 2010-01-21 to 2010-02-19
|
|
 |
|
 |
|
Methane Gas Capture and Fuel Switching at Compañía Argentina de Levaduras S.A.I.C. Plant Project
|
|
 |
|
The project comprises the recovery of biogas from an anaerobic digester to be built as part of an effluent treatment process at the CALSA plant. The recovered biogas would be used at the CALSA plant to replace fossil fuels for the production of heat
|
|
 |
|
 |
Closed 2009-12-22 to 2010-01-20
|
|
 |
|
 |
|
La Calera Biodigesters Project
|
|
 |
|
The purpose of the project is to reduce the methane emissions through an improved manure management:
|
|
 |
|
 |
Closed 2009-12-05 to 2010-01-03
|
|
 |
|
 |
|
ECC methane capture and combustion from AWMS at dairy farms in Mexico – I
|
|
 |
|
The proposed CDM project activity will reduce GHG emissions through the installation of covered lagoon type anaerobic digesters and combustion of the captured methane in a flare and/or energy generation equipment such as gen sets or boilers.
|
|
 |
|
 |
Closed 2010-03-09 to 2010-04-07
|
|
 |
|
 |
|
Macano Small Hydro Power Plant
|
|
 |
|
The Macano Small Hydro Power Plant, hereafter the project, consists of the construction and operation of a run-of-river hyDROP ower plant with a capacity of 3.428 MW
|
|
 |
|
 |
Closed 2010-02-27 to 2010-03-28
|
|
 |
|
 |
|
Cuevamaría Hydroelectric Project
|
|
 |
|
The Cuevamaría project consists of a capacity of the river project with no large dam or flooding, thus having minimum environmental impact
|
|
 |
|
 |
Closed 2009-11-19 to 2009-12-18
|
|
 |
|
 |
|
Fuel Switching Through Change of Furnaces at Imusa S.A
|
|
 |
|
The project activity is to implement energy improvements in the melting process of aluminium at Imusa S.A. Therefore, the five actual furnaces will be replaced by two modern induction furnaces of 500 kW each for the melting of aluminium
|
|
 |
|
 |
Closed 2009-11- 08 to 2009-12-07
|
|
 |
|
 |
|
Hydrolectric Project of the Amoya River
|
|
 |
|
The project consists of a greenfield run-of-river power plant with a nominal capacity of 80 MW and an anticipated generation of approximately 510 GWh/year
|
|
 |
|
 |
Closed
2009-07-03 to 2009-08-02
|
|
 |
|
 |
|
Caruquia 9.76 MW hydroelectric project
|
|
 |
|
The Caruquia hydroelectric project is a small run-of-river renewable small hydroelectric plant with a total installed capacity of 9,76 MW, located at the left margin of the Guadalupe River in the municipality of Santa Rosa de Osos, Department of Antioquia
|
|
 |
|
 |
Closed
2009-07-03 to 2009-08-02
|
|
 |
|
 |
|
Guanaquitas 9.74 MW hydroelectric project
|
|
 |
|
The Guanaquitas hydroelectric project is a small run-of-river renewable small hydroelectric plant with a total installed capacity of 9,74 MW, located at the Department of Antioquia
|
|
 |
|
 |
Closed
2009-07- 08 to 2009-08-08
|
|
 |
|
 |
|
Reduction of energy consumption during the production of hydraulic lime for the construction industry through the addition of non-calcined mineral components and additives. – Cementos Avellaneda S.A.Olavarría, Buenos Aires. Argentina.
|
|
 |
|
The owner of project has developed an innovation in its production process of hydraulic lime for construction purposes which reduces the consumption of energy during its production by adding Alternative Material and additives.
|
|
 |
|
 |
Closed
2008-04-01 to 2008 04 30
|
|
 |
|
 |
|
Aga Fano Liquid CO2 production using CO2 from a fermentation plant at Ingenio Providencia project
|
|
 |
|
The purpose of this project is to verify the design and the definition of baseline and monitoring plan in order to achieve emission reductions with no use of fossil fuel to produce liquid CO2 and it is changed by CO2 from a fermentation process
|
|
 |
|
 |
Closed
2008-11-18 to 2008-12-17
|
|
 |
|
 |
|
El Bote small hydroelectric Plant and Rural Electrification Project
|
|
 |
|
The objective of the project is to produce hydroelectricity for sale to the local communities of El Cuá and San José de Bocay municipalities, with any excess power to be sold to the national grid.
|
|
 |
|
 |
Open
2010 07 13 to 2010 08 12
|
|
 |
|
 |
|
Greenfield biogas project at Biocastilla industrial complex
|
|
 |
|
The purpose of the project activity is the installation of a system to recovery the biogas that would be generated during the treatment of the palm oil mill effluent (POME) at the new palm oil mill property of Biocastilla S.A.
|
|
 |
|
 |
Closed
2010 06 16 to 2010 07 15
|
|
 |
|
 |
|
Improving energy efficiency in a new Gas Plant in Gibraltar-Colombia
|
|
 |
|
The project activity is about the treatment of 30.3 MSCFD of associated gas from the field of Gibraltar through a more efficient technology (System TWISTER) adapted for the gas characteristics of the field.
|
|
 |
|
 |
Closed
2010 06 04 to 2010 07 03
|
|
 |
|
 |
|
Chamelecón 280 Hydroelectric project
|
|
 |
|
The project consists of renewable electricity generation from a run-of-river small hydro power plant utilizing the Chamelecón River near the community of Macuelizo, Honduras.
|
|
 |
|
 |
Closed
2010 06 04 to 2010 07 03
|
|
 |
|
 |
|
La vegona Hydroelectric Project
|
|
 |
|
The La Vegona Hydroelectric Project will utilize the flows of the Humuya or Comayagua River and will have an installed capacity of 38.5 MW and generate an average of 172 GWh/year producing sufficient renewable energy to supply more than 46,000 homes
|
|
 |
|
 |
 |